- Client:Palmetto CRA
- Info:Project Budget: $1,000,000 – The renovation of the Palmetto Boat Ramp represented a continuation of sustainable design initiatives and cooperative funding between the CRA and the SWFWMD. It was begun in 2014 and involved the replacement of the existing boat ramp facility with a wider ramp, additional docking, dredging and permeable pavers. Robert Gause served as the project manager for the CRA as well as the Landscape Architect on the project. Engineering services were provided by Lombardo, Foley & Kolarik, Inc. *Project work performed and led by Robert Gause while at Allison-Gause, Inc.